Architecture & engineering
Pitch your project without fear of seeing someone else build it.
Concept studies, plans and renders circulate in meetings, tenders and chat groups before any contract exists. When your idea shows up executed by someone else, proving it's yours — and that it came first — makes all the difference. Record every stage of the project in seconds and bring that proof to any negotiation.
The challenge
Where proof usually breaks down
The project leaves the meeting without you
Clients often keep the study, don't sign, and hire someone else to build the same idea.
Tenders without a trail
In competitions, similar entries spark authorship disputes. Without an undeniable date, it's one word against another.
Versions get lost
Successive revisions, renamed files and scattered emails make it hard to show how your work evolved and when.
How Docmint helps
Technical proof that's simple to create and easy to check
Every stage dated
Record from sketch to construction set. The sequence of block-dated records tells the story of your design.
Heavy files, no upload
The hash is computed on your machine, so models and plans of hundreds of megabytes never need to be sent anywhere.
One batch per project
Plans, sections, elevations and renders recorded together in a single transaction, with individual proof per file.
Leverage in negotiation
Mentioning that the study is recorded on a blockchain, with a verifiable receipt, changes any conversation about misuse.
What to record
Files worth recording
- Concept studies and scanned sketches
- Plans in DWG, PDF or RVT
- 3D models (SKP, IFC, BLEND) and renders
- Specifications and descriptive memos
- Client proposals and presentations
- Competition and tender entries
- Structural calculations and spreadsheets
- Site photos and progress reports
Any format works: Docmint records the file's fingerprint, not its content.
In practice: before the client meeting
You've finished the concept study for a house and will present it tomorrow.
- 1
Export the sheets as PDF and the final renders to a project folder.
- 2
Record the folder as a batch in Docmint, with the project name and phase in the title.
- 3
Download the receipts and mention in your proposal that the study is recorded.
- 4
If the idea is used without you, the records show the work was yours and existed on that date.
Best practices
- Record at the end of each phase: concept, design development, construction documents.
- Record exported files (PDF, images) as well as native files.
- Keep a "Recorded" folder per project with originals and receipts.
- Use consistent titles such as "House X — Design development — v2".
- Pair the record with a services contract and a copyright clause.
What the law says
Under the Berne Convention, followed by most countries, copyright in architectural and engineering works exists from creation, without registration. The practical challenge is proving authorship and date — which is where Docmint's technical record helps. It does not replace professional or permit filings required by your licensing body.
Frequently asked questions
Should I record the native file or the PDF?
Ideally both. The PDF is what the client receives; the native file shows the origin of the work. Both can go in the same batch.
Do very large files work?
Yes. The computation happens on your computer and only the fingerprint is sent, so file size doesn't matter.
Does it replace professional filings?
No. Mandatory professional filings remain. Docmint is additional proof of authorship and precedence for the design content.
See also
Photo & video
Prove authorship of originals before publishing or sending for approval.
Learn moreMusic
Lyrics, scores, beats and demos protected before release.
Learn moreDesign & illustration
Brand identities, illustrations and artwork with proven precedence.
Learn moreSoftware
Source code, algorithms and technical docs with a timestamp.
Learn moreStart with your next file.
Create your account in seconds and get 3 free records to try in your daily work.
